COVID Creation
Detailed account of an extensive restoration project on boat #3675 during COVID-19 lockdown, including varnish stripping, hull repairs, centerboard log repair, deck painting, new non-skid installation, hardware cleaning, and rigging modifications.
View original on Google Drive · page 12
The scanned issue opens in Google Drive; turn to page 12.
This is a summary. The full article text is © the Thistle Class Association — read the original scan via the link above.